Shaanxi Construction Machinery Co., Ltd. has done a good job in the "Three Prevention" work in the rainy season.
with the arrival of the summer rainy season, Shaanxi Construction Machinery Co., Ltd. has recently taken a number of measures to check and rectify the key parts of the "Three Prevention" (flood prevention, drainage prevention, lightning prevention) in the park and workshops in combination with safety production work, so as to solidly do a good job in the emergency response plan for dangerous situations in the rainy season and the storage of rescue materials. A week ago, the staff of the safety, environmental protection and construction management department began to check the drainage ditches, drainage wells and downpipes in the plant area, and organized workshops to clean up the sporadic garbage, clods and other debris in the drainage ditches; Corresponding protection and dredging measures are taken for the production and living facilities that are in danger and vulnerable to rain, as well as the parts that are prone to ponding, such as the road square experimental machine is a 1 precision testing instrument. In view of the actual situation that the battery car track connecting the two workshops is easy to accumulate water during the rain, which leads to the rainwater flowing into the workshops, the safety and environmental protection management department has timely distributed woven bags for each workshop, and packed sand and soil for flood control
Shaanxi Construction Machinery Co., Ltd. has also set up a leading group for the "Three Prevention" work in the rainy season to supervise and urge the rectification of the detected potential safety hazards in a timely manner, reserve emergency supplies for possible emergencies, and take emergency disposal measures when necessary, such as the transfer and evacuation project team has set up a number of professional teams, dredging and rescue, etc., to prepare human and material resources for the upcoming rainy season, and ensure that the response to dangerous situations is timely and organized effectively, Ensure the safety of the company's personnel, equipment and property
LINK
Copyright © 2011 JIN SHI